Devi, T Uma and Dwarapudi, Srinivas and Kumar, M G Sampath and Saralaya, D L and Gupta, S S (2006) Improvement and Optimization of Performance of Iron Ore Beneficiation Plant. In: Proceedings of the International Seminar on Mineral Processing Technology and Indo-Korean Workshop on Resource Recycling (MPT-2006), March 8-10, 2006, NML, Chennai.
| PDF 671Kb |
Abstract
JSW steel in an integrated steel plant of 2.5 Mtpa crude steel capacity and is being expanded to 10 Mtpa in phases. The plant facilities include 3 Mt Iron Ore Beneficiation Plant, 4.2 Mt Pellet Plant, 1.6 Mt Corex iron making, 0.9 Mt Blast Furnace, 2.5 Mt BOF — CCP and 2 Mt Hot Strip Mill. In order to control alumina in iron ore fines, the iron ore beneficiation plant was installed based on in-house developed process. During its operation of last two years, number of improvements and innovations have been introdu-ced to improve the reduction in alumina, improve yield and reduce moisture of concentrate.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Official URL/DOI: | http://eprints.nmlindia.org/6282 |
Uncontrolled Keywords: | Iron ore fines; beneficiation plant; Integrated steel plant; stubcyclone |
Divisions: | Mineral Processing |
ID Code: | 6282 |
Deposited By: | Sahu A K |
Deposited On: | 24 Dec 2012 09:51 |
Last Modified: | 24 Dec 2012 09:51 |
Related URLs: |
Repository Staff Only: item control page