Ray, P K and Kumaraswamy, A and Bandopadhyay, A and Rao, T C (1985) Performance Studies on the Crushing and Screening Circuit at South Bank Treatment Plant of Hindustan Copper Ltd. In: Processing of National Seminar on Mineral Processing and IX Annual Technical Convention of Indian Institute of Mineral Engineers, 11th & 12th March 1985, National Metallurgical Laboratory(CSIR) Jamshedpur.
53-57.PDF
Download (1MB)
Abstract
The global energy crisis, inflation and financial diffi-culties, spiralling increase in operating costs against non-remunerative prices of the finished products are generally the constraints for expansion and modernisat-
ion of any mineral processing plant today.However, a very careful look is warranted for before taking any investment decision and a prudent justification for evaluation of the full potential of any plant. The Treatment Plant at South Bank (TPSB) is a typical old plant of HCL/ICC and is the subject of present study.
| Item Type: | Conference or Workshop Item (Paper) |
|---|---|
| Uncontrolled Keywords: | Screeening circuit; inflation; financial difficulties |
| Subjects: | Minerals and Mining |
| Divisions: | Mineral Processing |
| Depositing User: | Users 5 not found. |
| Date Deposited: | 08 Dec 2011 11:42 |
| Last Modified: | 08 Dec 2011 11:42 |
| URI: | http://ictu2016-114.nmlindia.org/id/eprint/4380 |

