Experiments on Blast Furnace Operation in Yawata Iron and Steel Works

Wada, K and Honda, A (1960) Experiments on Blast Furnace Operation in Yawata Iron and Steel Works. In: Symposium on Pilot Plants in Metallurgical Research and Development, 15-18/02/1960, Jamshedpur.

[thumbnail of paper_18.PDF] PDF
paper_18.PDF

Download (3MB)

Abstract

3 Ton/day Experimental Blast Furnace:

Results of the experimental research carried out on
a 3 ton-per-day blast furnace to improve operational efficiency can be briefly stated as follows:-

i) Effect of crushing and screening of raw materials:

Iron ores and metallurgical coke of four different
sizes were successively smelted in the furnace. Optimum sizes for iron ore and coke were found to be 6.5 mm. and 17.2 mm. respectively.

Item Type: Conference or Workshop Item (Lecture)
Uncontrolled Keywords: Iron ore; coke; coal mixture; sulphur content
Subjects: Metallurgy
Divisions: Metal Extraction and Forming
Depositing User: Users 5 not found.
Date Deposited: 20 Sep 2011 06:16
Last Modified: 26 Dec 2011 10:30
URI: http://eprints.nmlindia.org/id/eprint/3961

Actions (login required)

View Item
View Item