Pandey, B D and Mehta, K D and Kumar, Vinay and Singh, S and Giri, A K (2007) Biomineral Processing for Extraction of Metal Values from Ores/Concentrates/Wastes. Other (TMP). CSIR-NML, Jamshedpur. (Submitted)
Full text not available from this repository. (Request a copy)Abstract
Lean copper ore (-0.3-0.4% Cu) of Malanjkhand Copper Project (MCP) is a granite rock with copper as chalco-pyrite in the quartz veins. XRD identification of the ore showed chalcopyrite, pyrite and silica as major phases and bornite being the minor phase. The wild strains of Acidi-thiobacillus ferrooxidans (Tf) isolated from source mine water in 9K+ medium were used for bioleaching. On bench scale with non-adapted Tf isolate, maximum (72%) Cu biodissolution was found at 2.0 pH, 5%PD using <50um particles at 35oC temperature in 40 days. Whereas, using Tf isolate adapted on 5%(w/v) ore at 2.0pH and 25oC, copper biorecovery rose to 75% under same conditions.
| Item Type: | Project Reports (Other (TMP)) |
|---|---|
| Uncontrolled Keywords: | bioleaching; nonferrous metals; low grade ores; copper; uranium |
| Subjects: | Metallurgy |
| Divisions: | Metal Extraction and Forming |
| Depositing User: | Users 5 not found. |
| Date Deposited: | 12 Jul 2013 04:39 |
| Last Modified: | 12 Jul 2013 04:39 |
| URI: | http://eprints.nmlindia.org/id/eprint/6510 |

