Improvement and Optimization of Performance of Iron Ore Beneficiation Plant

Devi, T Uma and Dwarapudi, Srinivas and Kumar, M G Sampath and Saralaya, D L and Gupta, S S (2006) Improvement and Optimization of Performance of Iron Ore Beneficiation Plant. In: Proceedings of the International Seminar on Mineral Processing Technology and Indo-Korean Workshop on Resource Recycling (MPT-2006), March 8-10, 2006, NML, Chennai.

[thumbnail of 458.PDF]
Preview
PDF
458.PDF

Download (687kB)

Abstract

JSW steel in an integrated steel plant of 2.5 Mtpa crude steel capacity and is being expanded to 10 Mtpa in phases. The plant facilities include 3 Mt Iron Ore Beneficiation Plant, 4.2 Mt Pellet Plant, 1.6 Mt Corex iron making, 0.9 Mt Blast Furnace, 2.5 Mt BOF — CCP and 2 Mt Hot Strip
Mill.
In order to control alumina in iron ore fines, the iron ore beneficiation plant was installed based on in-house developed process. During its operation of last two years, number of improvements and innovations have been introdu-ced to improve the reduction in alumina, improve yield and reduce moisture of concentrate.

Item Type: Conference or Workshop Item (Paper)
Uncontrolled Keywords: Iron ore fines; beneficiation plant; Integrated steel plant; stubcyclone
Subjects: Minerals and Mining
Divisions: Mineral Processing
Depositing User: Users 5 not found.
Date Deposited: 24 Dec 2012 04:21
Last Modified: 03 Sep 2026 07:52
URI: http://eprints.nmlindia.org/id/eprint/6282

Actions (login required)

View Item
View Item