Sinha, K M (1981) Layout of Modern Converter Steel Plant for the Production of 1.5 Million Tonnes per year of Continuously Cast Billets. In: International Symposium on Modern Developments in Steelmaking, February 16-18, 1981, NML, Jamshedpur.
2.6.1-2.6.20.PDF
Download (5MB)
Official URL/DOI: http://eprints.nmlindia.org/5945
Abstract
In the famework of an international tender a converter
steel plant has been proposed which will Rroduce 1.5 million tons of liquid steel and will be suitable for expansion to 3.0 m.t.p.a. of liquid steel. The product
of the steel plant is supposed to be cast to billets of max. 130 mm square.
| Item Type: | Conference or Workshop Item (Paper) |
|---|---|
| Uncontrolled Keywords: | 1.5 million tonnes; casting machines; additional vessel; melting shop; ferro alloy |
| Subjects: | Metallurgy |
| Divisions: | Metal Extraction and Forming |
| Depositing User: | Users 5 not found. |
| Date Deposited: | 23 Aug 2012 03:58 |
| Last Modified: | 14 May 2013 04:18 |
| URI: | http://eprints.nmlindia.org/id/eprint/5945 |

