Preparation of copper powder from the waste copper solution by the process of cementation

Prasad, Sanjay (2002) Preparation of copper powder from the waste copper solution by the process of cementation. Journal of Metallurgy and materials Science, 44 (4). pp. 217-221.

[thumbnail of 217-221.PDF] PDF
217-221.PDF
Restricted to NML users only. Others may use ->

Download (868kB) | Request a copy

Abstract

Copper recovery by cementation process from a copper waste solution containing 120g/l copper and 120g/l HCI was studied. Iron power was used for the cementation. It was found that without dilution of waste copper solution the recovery of copper powder is low 28.3%. With the dilution of solution the powder formation increases and an optimum recovery of 87.5% copper was found in 5 times diluted solution in 15 minutes ofleaching. The two-stage cementation process yielded almost complete recovery of copper as copper powder. The purity of copper powder was found 98% and apparent density was 1.8g/cm3.

Item Type: Article
Uncontrolled Keywords: Cementation ; Copper powder ; Waste copper solution
Subjects: Metallurgy
Divisions: Metal Extraction and Forming
Depositing User: Users 5 not found.
Date Deposited: 26 Jul 2010 05:03
Last Modified: 03 May 2012 09:02
URI: http://eprints.nmlindia.org/id/eprint/1288

Actions (login required)

View Item
View Item