Noise Modelling in Highly Mechanised Bauxite Mines - A Case Study at Panchpatmali Bauxite Mines of NALCO

Pal, A K and Mishra, B P and Roul, A (2006) Noise Modelling in Highly Mechanised Bauxite Mines - A Case Study at Panchpatmali Bauxite Mines of NALCO. In: Proceedings of the International Seminar on Mineral Processing Technology and Indo-Korean Workshop on Resource Recycling (MPT-2006), March 8-10, 2006, NML, Chennai.

[thumbnail of 415-430.PDF] PDF
415-430.PDF

Download (3MB)

Abstract

Panchpatmali Bauxite deposit is the one amongst a series of bauxite deposits which were discovered in the east coast region of India in early 1960s to put India in the 5th position in the world's Bauxite map with a total bauxite reserve over 02(two) billion tonnes and current annual production is about 4.8 million tonnes per annum which is now under expansion to 6.3 Milion tonne. Consi-dering its vast deposit containing over 300 million tonnes reserve, Panchpatmali bauxite deposit under name and style of NALCO Ltd., was picked up

Item Type: Conference or Workshop Item (Paper)
Uncontrolled Keywords: bauxite mines; bauxite exploitation; industrial complexes; meteorological parameters
Subjects: Minerals and Mining
Divisions: Mineral Processing
Depositing User: Users 5 not found.
Date Deposited: 20 Dec 2012 04:51
Last Modified: 20 Dec 2012 04:51
URI: http://eprints.nmlindia.org/id/eprint/6272

Actions (login required)

View Item
View Item